Greater Nottingham Strategic Plan - Preferred Approach Consultation (January 2023)

Greater Nottingham Strategic Plan: Preferred Approach

Appendix A: Preferred Sites (Gedling Borough)

Teal Close (Gedling Borough) - G11.2PA

Teal Close (Gedling Borough) - G11.2PA

Factor

Site Information

Authority Area:

Gedling Borough

Site Size:

Approximately 64.69 ha

Planning Status:

Allocation in Aligned Core Strategy. Site has outline consent (2013/0546) and reserved matters consents as follows:

  • 2017/0800 (phase 1 housing development);
  • 2019/0153 (phase 2 housing development);
  • 2019/0560 (phase 3 housing development); and
  • 2019/1191 (66 bed care home).

Site has outline consent (2013/0546) for mixed B1- B8 employment uses (up to 18,000 square metres) and reserved matters consents as follows:

  • 2019/0614 (employment development on 3.4 ha); and
  • 2019/0615 (employment development on 3.05 ha).

Housing Units:

228 dwellings completed (ACS allocation).

579 dwellings remaining (ACS allocation).

Employment Units:

3.4 ha of employment land completed (ACS allocation).

3.05 ha of employment land remaining (ACS allocation).

Other Uses:

Local Centre, community building, care home, education, formal and informal recreation and green infrastructure.

Timescale for Delivery:

Under construction. As at 31st March 2022, 228 dwellings have already been built.

Transport:

See planning application documents.

Education:

See planning application documents.

Health:

See planning application documents. 

Utilities:

See planning application documents. 

Other:

None.

Gedling Colliery/Chase Farm (Gedling Borough) - G09.3PAMap

Factor

Site Information

Authority Area:

Gedling Borough

Site Size:

Approximately 47 ha

Planning Status:

Strategic location in Aligned Core Strategy and allocation in the Part 2 Local Plan.

The site is currently under construction for 508 homes on phase 1 (2015/1376, 2017/1018, 2017/1076, 2017/1275, 2018/0249, 2018/0392, 2019/0304, 2019/0586, 2019/0759 and 2020/0667). Reserved matters for the 2nd housing phase of 433 homes (2021/1294) granted in March 2022. Total figure granted to date is 941 homes. Resolution to grant full planning application for 24 homes on the remainder part of the site (2022/0200) in June 2022 subject to the signing of the s106.

Site has outline consent (2017/1571) for the erection of employment units on 2.45 ha equating to the net developable area for employment development.

Housing Units:

965 dwellings.

Employment Units:

2.45 ha remaining.

Other Uses:

Leisure, education, green infrastructure.

Timescale for Delivery:

Under construction. As at 31st March 2022, 340 homes have been built.

Transport:

See planning application documents.

Education:

See planning application documents.

Health:

See planning application documents.

Utilities:

See planning application documents.

Other:

None.

Top Wighay Farm (Gedling Borough) - G03.1/G03.2PA

Factor

Site Information

Authority Area:

Gedling Borough

Site Size:

Approximately 77 ha

Planning Status:

Allocation in Aligned Core Strategy. Part of the site for 38 homes (2014/0950) is complete.

Site has outline consent (2020/0050) for mixed use development for 805 homes and up to 49,500 square metres of employment uses on 8.55 ha of land (gross).

Planning permission (7/2022/0050NCC) has been granted for the construction of an office building (Use Class E (g)(i) on 1.3 ha of land.

A reserved matters application for the remainder of the housing development is anticipated later in 2022/23.

Housing Units:

38 dwellings completed (ACS allocation).

805 dwellings remaining (ACS allocation).

640 dwellings (proposed extension).

Employment Units:

8.55 ha (gross), 6.5 ha (net) based on planning application (2020/0050).

Other Uses:

Education, health and green infrastructure.

Timescale for Delivery:

Access has been constructed. 38 dwellings competed. Commencement of housing site anticipated 2023/24.

Transport:

See planning application documents.

Education:

See planning application documents.

Health:

See planning application documents.

Utilities:

See planning application documents.

Other:

Account will need to be taken of the potential impact of the extension to the allocation on the Local Wildlife Site within the site.

North of Papplewick Lane (Gedling Borough) - G03.4PA

North of Papplewick Lane (Gedling Borough) - G03.4PA

Factor

Site Information

Authority Area:

Gedling Borough

Site Size:

10 ha

The planning application also includes land outside the strategic allocation in the same ownership to the north east which remains in the Green Belt for surface water attenuation.

Planning Status:

Allocation in Aligned Core Strategy. The site is under construction for 255 homes including an additional 18 homes (2017/0201 and 2020/0258).

Housing Units:

172 dwellings completed (ACS allocation).

83 dwellings remaining (ACS allocation).

Employment Units:

None.

Other Uses:

Education, green infrastructure.

Timescale for Delivery:

Under construction. As at 31st March 2022, 172 homes have been built.

Transport:

See planning application documents.

Education:

See planning application documents.

Health:

See planning application documents.

Utilities:

See planning application documents.

Other

The Part 2 Local Plan allocates land to the east for 120 homes (H10, Hayden Lane).